1 project matched your search:
Unique ID Number = 122



Mary's Creek



Mary's Creek - Potential

1997 orthophotography available from the RIGIS Orthophoto Server. Click image for printable PDF.
Courtesy: R.I. Department of Transportation
Mary's Creek
Courtesy: Save The Bay
Project Location:  Warwick

Project Map- Click to open the Restoration Atlas mapping application in a new window. (The map will automatically be zoomed in to this restoration site.) *Note: this application is best viewed using Internet Explorer.

Access Point(s):   Not documented for this site.

Public Use:  Boat Ramp; Public Park

Impacts:  <15% of adjacent upland areas within 500' of marsh consists of impervious surfaces. >20% of upland/marsh perimeter consists of man-made shoreline armoring. In regions where primary land use is commercial, industrial, and highway there is an unmanaged vegetative buffer zone occurring along 51-75% of the upland/marsh perimeter. Where primary land use is medium to high density residential there are regions where an unmanaged buffer zone occurs along 26-50% of the upland/marsh perimeter and other regions where the zone occurs along 0-25%. At the w12 site fill material SW of the marsh can be found from the marina. Discharge comes from a 1.5' pipe for stormwater. At the w14 site dirt road fill abuts the north side of the marsh.

Project Size:   Not documented for this site.

Area Benefited:   Not documented for this site.

Restoration Description:  Hydrologic Restoration

Restoration Date:   Not documented for this site.

Target Species:   Data not available

Historic Conditions:  At the w15 site tides are restricted by a railroad. Large amounts of trash and evidence of dumping are visible here, and the marsh is actually larger than mapped. 2 old 20'docks or barges can be found on the marsh at site w14 and road gravel is present here as well.

Project Contact Info:   Not documented for this site.

Partners:   Save The Bay

Pre and Post Restoration Data:  False, False

Monitoring:
    Start Date:   Not documented for this site.
    End Date:   Not documented for this site.
    Completed:  To be determined
    Leader:  To be determined
    Scheduled:  To be determined

Studies Conducted:   Not documented for this site.

Cost of Project:  Not documented for this site

Public Property Owners:  n/a

Info Source:  Not Documented for this site


Return to top