1 project matched your search:
Unique ID Number = 109



Cole River



Cole River - Potential

Project Location:  Swansea/Rehoboth

Project Map- Click to open the Restoration Atlas mapping application in a new window. (The map will automatically be zoomed in to this restoration site.) *Note: this application is best viewed using Internet Explorer.

Access Point(s):   Not documented for this site.

Public Use:  Not documented for this site.

Impacts:  Fills are suspected from route 6 and along eastern side of marsh from golf range. Erosion problems exist on the south end property due to no buffer and lawn. >20% of the vegetative cover includes invasive plants, and phragmites dominates the northeast sections of marsh. Tides are greatly restricted. <15% of adjacent upland areas within 500' of marsh consists of impervious surfaces. <5% of upland/marsh perimeter consists of man-made shoreline armoring. An unmanaged vegetative buffer zone occurs along 51-75% of the upland/marsh perimeter. (reported STB,1996)

Project Size:   Not documented for this site.

Area Benefited:   Not documented for this site.

Restoration Description:  Hydrologic Restoration

Restoration Date:   Not documented for this site.

Target Species:   Data not available

Historic Conditions:  Eastern bordering farm was recently converted to a driving range (reported STB, 1996).

Project Contact Info:   Not documented for this site.

Partners:   Save The Bay

Pre and Post Restoration Data:  False, False

Monitoring:
    Start Date:   Not documented for this site.
    End Date:   Not documented for this site.
    Completed:  To be determined
    Leader:  To be determined
    Scheduled:  To be determined

Studies Conducted:   Not documented for this site.

Cost of Project:  Not documented for this site

Public Property Owners:  n/a

Info Source:  Not Documented for this site


Return to top