2 projects matched your search:
Unique ID Number = 89

OR Unique ID Number = 17



Allin’s Cove
Bullocks Cove



Allin’s Cove - Ongoing

1997 orthophotography available from the RIGIS Orthophoto Server. Click image for printable PDF.
Courtesy: R.I. Department of Transportation
Allin’s Cove
Courtesy: NOAA
Additional Photos
Project Location:  Barrington

Project Map- Click to open the Restoration Atlas mapping application in a new window. (The map will automatically be zoomed in to this restoration site.) *Note: this application is best viewed using Internet Explorer.

Access Point(s):   Not documented for this site.

Public Use:  Not documented for this site.

Impacts:  Filling is alleged on the lot at the end of Greene St and is likely on Razzi's parking lot (off Spring St). There is also filling at the plastics factory dump, at the end of Bicknell St. There are also potential toxics in the marsh from historical industrial use.

Project Size:  11 acres

Area Benefited:   Not documented for this site.

Restoration Description:  Minimize erosion along by-way road.

Restoration Date:   Not documented for this site.

Target Species:   Data not available

Historic Conditions:  In 1904 construction began for RI Laceworks; in 1910, the company was in full operation. Laceworks used dyes in production. Residents report that the color of the dye being used was visible in the water of Allin's Cove. In 1959 the quarry used the site for dredge material disposal. The area was also used for agriculture in the 1800s. In 1997 demolition of the factory was proposed. Sometime between 1900 and 1920 the Pilling Chain Factory was built. In the 1960s-1970s Krew Frame operated on the second floor of the factory. Pilling Chain manufactured zipper chains and sliders. Acid washings, zinc, plating material, and chrome plating were dumped in Allin's Cove. Krew Frame made metal picture frames. In 1991, all operations at Pilling Chain ended and the space was leased to small businesses (Hill's Auto and Tire, a bicycle storage space, an upholstery shop, a woodworking shop, and insulation shop, and a man who made and sold face creams). In 1996, the factory was renovated for Barrington Apartments, which opened in 1997.

Project Contact:

    Coastal Resources Management Council
    4808 Tower Hill Road, Wakefield, RI 02879
    401-783-7350

Partners:   Allin's Cove Association, Coastal Resources Management Council, DEM Narragansett Bay Estuary Program, DEM Mosquito Abatement Coordination Program, RI Geological Survey, Save The Bay, Town of Barrington, URI Geosciences Department, US Army Corps of Engineers, US Fish & Wildlife Service

Pre and Post Restoration Data:  True, False

Monitoring:
    Start Date:   Not documented for this site.
    End Date:   Not documented for this site.
    Completed:  To be determined
    Leader:  To be determined
    Scheduled:  Sediments

Studies Conducted:  Hydrology, tidal range, elevation, vegetation

Cost of Project:
    Total Cost ($):  760000
    Federal Share ($):  570000
    Non-Federal Share ($):  190000

Public Property Owners:  State of Rhode Island

Info Source:  Not Documented for this site


Return to top



Bullocks Cove - Potential

1997 orthophotography available from the RIGIS Orthophoto Server. Click image for printable PDF.
Courtesy: R.I. Department of Transportation
Bullocks Cove
Courtesy: Save The Bay
Project Location:  East Providence

Project Map- Click to open the Restoration Atlas mapping application in a new window. (The map will automatically be zoomed in to this restoration site.) *Note: this application is best viewed using Internet Explorer.

Access Point(s):   Not documented for this site.

Public Use:  Public Park

Impacts:   Not documented for this site.

Project Size:   Not documented for this site.

Area Benefited:   Not documented for this site.

Restoration Description:  Buffer Management; Hydrologic Restoration; Stormwater Management

Restoration Date:   Not documented for this site.

Target Species:   Data not available

Historic Conditions:   Not documented for this site.

Project Contact Info:   Not documented for this site.

Partners:   Save The Bay

Pre and Post Restoration Data:  False, False

Monitoring:
    Start Date:   Not documented for this site.
    End Date:   Not documented for this site.
    Completed:  To be determined
    Leader:  To be determined
    Scheduled:  To be determined

Studies Conducted:   Not documented for this site.

Cost of Project:  Not documented for this site

Public Property Owners:  n/a

Info Source:  Not Documented for this site


Return to top