2 projects matched your search: Unique ID Number = 35 OR Unique ID Number = 194 Cross Mills Brook Dam King Tom Pond Dam Cross Mills Brook Dam - Ongoing |
|||||
Project Map- Click to open the Restoration Atlas mapping application in a new window. (The map will automatically be zoomed in to this restoration site.) *Note: this application is best viewed using Internet Explorer. Access Point(s): boat ramp, conservation/wildlife area, path shore Public Use: Boat Ramp; Conservation/ Wildlife Area; Path to Shore Impacts: Road and mill construction in the area during the 1950's involved rerouting the historic channel through a culvert which passed under a road. Fish currently migrate up to this point, but do not negotiate the rerouted channel due to awkward curves and a lack of daylight under the road (USACE-NED 2002). Project Size: 20 acres Area Benefited: 20 acres Restoration Description: Two aluminum steeppass fishways will be installed, along with a new, shorter concrete culvert. A trap and transport program was considered in the original suite of alternatives for the project. However, this option was determined to be impractical due to land access restrictions. Restoration Date: Not documented for this site. Target Species: river herring Historic Conditions: Historically, herring and shad spawned in the pond, migrating to and from Block Island Sound via Cross Mills Brook and Ninigret Pond. Project Contact:
4808 Tower Hill Road, Wakefield, RI 02879 401-789-3094 Partners: Coastal Resources Management Council, DEM Fish & Wildlife, DEM Narragansett Bay Estuary Program, National Marine Fisheries Service, RI Sea Grant, Town of Charlestown, Town of South Kingstown, Town of Westerly, US Army Corps of Engineers, US Fish & Wildlife Service Pre and Post Restoration Data: False, False Monitoring:
End Date: Not documented for this site. Completed: To be determined Leader: To be determined Scheduled: To be determined Studies Conducted: Not documented for this site. Cost of Project:
Federal Share ($): 276000 Non-Federal Share ($): 149000 Public Property Owners: n/a Information Source:
DEM Division of Fish & Wildlife 4808 Tower Hill Road, Wakefield, RI 02879 derkan@dem.state.ri.us 401-783-2304 Return to top King Tom Pond Dam - Potential |
|||||
Project Map- Click to open the Restoration Atlas mapping application in a new window. (The map will automatically be zoomed in to this restoration site.) *Note: this application is best viewed using Internet Explorer. Access Point(s): Not documented for this site. Public Use: Not documented for this site. Impacts: Obstruction present Project Size: 9 acres Area Benefited: 9 acres Dam Information:
Type: EARTH Purpose: RECREATION Year Completed: Length: 100 feet Height: 6 feet Maximum Discharge: 100 cubic feet per second Maximum Storage: 12 acre-feet Restoration Description: Fish passage restoration. Fishway construction. Restoration Date: Not documented for this site. Target Species: river herring Historic Conditions: Dam prevents fish passage. Project Contact:
4808 Tower Hill Road, Wakefield, RI 02879 401-789-3094 Partners: DEM Fish & Wildlife Pre and Post Restoration Data: False, False Monitoring:
End Date: Not documented for this site. Completed: To be determined Leader: To be determined Scheduled: To be determined Studies Conducted: Not documented for this site. Cost of Project: Not documented for this site Public Property Owners: n/a Information Source:
DEM Division of Fish & Wildlife 4808 Tower Hill Road, Wakefield, RI 02879 derkan@dem.state.ri.us 401-783-2304 Return to top |