Unique ID Number = 35

OR Unique ID Number = 194



Cross Mills Brook Dam
King Tom Pond Dam



Cross Mills Brook Dam - Ongoing

1997 orthophotography available from the RIGIS Orthophoto Server. Click image for printable PDF.
Courtesy: R.I. Department of Transportation
Cross Mills Brook
Courtesy: Coastal Resources Management Council
Additional Photos
Project Location:  Cross Mills Brook

Project Map- Click to open the Restoration Atlas mapping application in a new window. (The map will automatically be zoomed in to this restoration site.) *Note: this application is best viewed using Internet Explorer.

Access Point(s):  boat ramp, conservation/wildlife area, path shore

Public Use:  Boat Ramp; Conservation/ Wildlife Area; Path to Shore

Impacts:  Road and mill construction in the area during the 1950's involved rerouting the historic channel through a culvert which passed under a road. Fish currently migrate up to this point, but do not negotiate the rerouted channel due to awkward curves and a lack of daylight under the road (USACE-NED 2002).

Project Size:  20 acres

Area Benefited:  20 acres

Restoration Description:  Two aluminum steeppass fishways will be installed, along with a new, shorter concrete culvert. A trap and transport program was considered in the original suite of alternatives for the project. However, this option was determined to be impractical due to land access restrictions.

Restoration Date:   Not documented for this site.

Target Species:   river herring

Historic Conditions:  Historically, herring and shad spawned in the pond, migrating to and from Block Island Sound via Cross Mills Brook and Ninigret Pond.

Project Contact:

    DEM Division of Fish & Wildlife
    4808 Tower Hill Road, Wakefield, RI 02879
    401-789-3094

Partners:   Coastal Resources Management Council, DEM Fish & Wildlife, DEM Narragansett Bay Estuary Program, National Marine Fisheries Service, RI Sea Grant, Town of Charlestown, Town of South Kingstown, Town of Westerly, US Army Corps of Engineers, US Fish & Wildlife Service

Pre and Post Restoration Data:  False, False

Monitoring:
    Start Date:   Not documented for this site.
    End Date:   Not documented for this site.
    Completed:  To be determined
    Leader:  To be determined
    Scheduled:  To be determined

Studies Conducted:   Not documented for this site.

Cost of Project:
    Total Cost ($):  425000
    Federal Share ($):  276000
    Non-Federal Share ($):  149000

Public Property Owners:  n/a

Information Source:
    Dennis Erkan
    DEM Division of Fish & Wildlife
    4808 Tower Hill Road, Wakefield, RI 02879
    derkan@dem.state.ri.us
    401-783-2304

Return to top



King Tom Pond Dam - Potential

1997 orthophotography available from the RIGIS Orthophoto Server. Click image for printable PDF.
Courtesy: R.I. Department of Transportation
Project Location:  Cross Mills Brook

Project Map- Click to open the Restoration Atlas mapping application in a new window. (The map will automatically be zoomed in to this restoration site.) *Note: this application is best viewed using Internet Explorer.

Access Point(s):   Not documented for this site.

Public Use:  Not documented for this site.

Impacts:  Obstruction present

Project Size:  9 acres

Area Benefited:  9 acres

Dam Information:  
    Name: KING TOM POND DAM
    Type: EARTH
    Purpose: RECREATION
    Year Completed:
    Length: 100 feet
    Height: 6 feet
    Maximum Discharge: 100 cubic feet per second
    Maximum Storage: 12 acre-feet

Restoration Description:  Fish passage restoration. Fishway construction.

Restoration Date:   Not documented for this site.

Target Species:   river herring

Historic Conditions:  Dam prevents fish passage.

Project Contact:

    DEM Division of Fish & Wildlife
    4808 Tower Hill Road, Wakefield, RI 02879
    401-789-3094

Partners:   DEM Fish & Wildlife

Pre and Post Restoration Data:  False, False

Monitoring:
    Start Date:   Not documented for this site.
    End Date:   Not documented for this site.
    Completed:  To be determined
    Leader:  To be determined
    Scheduled:  To be determined

Studies Conducted:   Not documented for this site.

Cost of Project:  Not documented for this site

Public Property Owners:  n/a

Information Source:
    Dennis Erkan
    DEM Division of Fish & Wildlife
    4808 Tower Hill Road, Wakefield, RI 02879
    derkan@dem.state.ri.us
    401-783-2304